Kickin butt and kickin back on vacation the last two weeks

The project is starting to show some progress. We were blessed with a long weekend at the beach (THANKS JIM AND BONNIE FOR THE USE OF YOUR GR8 PLACE) with all of the children and grandchildren (Leslie, Jeff with Koty and Tyler from Monroe, NC; Megan with Eleri from Albuquerque, NM (sorry you had to work Sam you missed a gr8 time) as well as Lauren and Eli with Vinny and Jaxon from Columbia, SC (soon to be from Boulder, CO.)) We will put some pics on the next post
We are shooting for Thanksgiving to be all done with the upstairs. Yes, I said the upstairs. As projects tend to grow and take on a larger scope so has this one. Starting as just a new kitchen has now expanded into a new half bath, moving the laundry, new doors throughout upstairs, new hardwood flooring, new on-demand water heater, new trim throughout upstairs, new paint in most of the upsatirs, etc, etc, etc.
Don't get me wrong, we can do it. I am married to the best woman in the world and she loves to assist, it makes the project go so much faster when everyone is on the same page. I am so lucky and priveledged
Drywall has been taped, primed and ceiling/walls painted. 1/4 of the cabinets came on Saturday 7/26 (yesterday). What you see is the oven cabinet that will house the double oven with microwave/convection oven abobe making it a three built-in oven cabinet.
Drawer units, refrigerator unit (upside down) and 9' corner pantry cabinet.
This shows the spice/seasoning rack that will be on each side of the cooktop housing all of the spices, vinegars, ect. We are playing with stain on the sides of the cabinets to determine what color they will be.
This is the base of the built in china cabinet that will sit on the left of the fireplace.
Looking hard you can see the six 4" can lights that are on the outside ceiling, there are six more on the other side of the ceiling and three pendent lights that will gp over the island.
This shows some of the cabinets that are on the side of the triple oven cainet. This cabinet goes around the chimney of the downstairs fireplace.

Sunday, July 13, 2008

Drywalling and bringing it closer

The following pics show the guys taping. The rockers showed up on Friday and put up the majority of drywall in the new kitchen, laundry and 1/2 bath. Saturday they taped the seams and today, Sunday, they are putting on the bed coat.
Notice how the peak appears to be in the center of the fireplace, this was accomplished by lowering the ceiling on the left side of the following picture.
Cabinets are going where there is no drywall here. Power for the 3 ovens and speaker wires for the digital am/fm and surround sound will run between the wood on the brick