Drain work under the new toilet and new location for the washer
New 3" pipe for the new half bath and relocated laundry. This will be extended into the kitchen addition once the island is in place.

Just a shot of the two new vents through the roof for the new half bath (there already was one there for the old kitchen sink). They will not be noticable once we spray them flat black.

New water outlet for new refrig's icemaker.


Drain and supply for sink in half bath. We had to build a wall out in front of the existing wall as there was a massive header underneath which prevented running the drains.

Rough in for the new toilet (water supply drain and vent.

Rough in for the new location of the washer.

Mr. Kerr, head plumber and company owner, figuring out just how all of this is going to go together.